1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
Key Responsibilities
Site Mobilization
Understanding of infrastructure requirement and drawings.
Ensuring the Site mobilization as per the Site engineer's instructions.
Project Execution
Understand methodology of each site activity and implementation.
To execute all construction activities as per given data and instructions by the senior engineer.
To execute site work with accuracy & precision and all as per ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
1.Diploma/ ITI in Electrical with 1 years of relevant maintenance experience in substation & similar Utility plant such as Chillers, cooling towers, compressors, HT LT Motors, pumps, etc.. 2.Should have sound knowledge& skill on best maintenance practices, procedures and systems.3.Shall be well versed and experienced with LOTO procedures of HT and ...
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.56 LPA TO 1.74 LPA
Job Summary:We are seeking a skilled and dedicated Fitter with 1-5 years of experience in heavy machinery manufacturing or waste water treatment. The ideal candidate should possess expertise in MS and SS fabrication, plumbing and electrical fitting, as well as proficiency in welding techniques such as Argon and Arc welding. ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
6.00 LPA TO 8.00 LPA
DETAILED JOB DESCRIPTION: (HIGHLIGHT CRITICAL ACTIVITIES)1. Responsible for filling & and maintaining the project tracker as per assigned project within 24 hours ofassignment.2. Review the project tracker with NPD Facilitator within 48 hours after assignment.3. Responsible for identifying the project team that will work on the specified project.4. Responsible for ...
1 Opening(s)
7.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 12.00 LPA
Role Purpose:Customer focus - Delivering products well within customer’s expectations on delivery, service, communicationsetcSafety- Building a safer work environment through People centric actionsQuality- Relevant Product quality acceptable to the customer without any defectsDelivery- Delivering on committed timelines to the customer. Deliver in terms of overall improvements inoperations (OTIF)Cost- Developing and ...
1 Opening(s)
4.0 Year(s) To 6.0 Year(s)
8.00 LPA TO 10.00 LPA
Role Purpose: Contributing to develop and optimizing industrial processes and improvement in currentprocesses to enhance performance and productivity of fabrication by using technical skills, best practices inmanufacturing etc.COMPETENCIES: (Rank based on the importance)1. Systems Thinking & Designing (3)2. Process & Detail orientation (1)3. Creative thinking & Exploration (4)4. Analysis & ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.00 LPA
Experience : 3-5 yeas (Chilled water system design in must)
Have experience in HVAC design e.g. chiller, VRV, AHU, Heat loading and ducting
Key Skills: Heat load , pump head calculation , AutoCAD drawing preparation , BOM working , indenting , TDS preparation , coordination with consultant and PMC for approval etc.
Lead ...
1 Opening(s)
5.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.00 LPA
Education : BE /Diploma - Mechanical
Understanding project specifications and developing time schedules and budgets that meet them.
Negotiating with vendors and contractors to secure the best prices.
Observing existing processes, analyzing staff performance, and addressing deficiencies accordingly.
Monitoring and tracking project progress, and writing up reports.
Attending and scheduling meetings as required.
Delegating tasks and ...
1 Opening(s)
5.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 6.00 LPA
Minimum of 5-7 years of experience in a similar role within the pharmaceutical or process equipment industry.
Diploma in Mechanical/Fabrication Engineering, Bachelor’s degree in Engineering or a related field.
Proven experience in the design and development of static process equipment and stainless-steel equipment.
Proficiency in CAD software (e.g., AutoCAD, SolidWorks) and other engineering ...
1 Opening(s)
4.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 5.40 LPA
Read blueprints and drawings to understand or plan the layout of plumbing, waste disposal and water supply systems
Cut, assemble and install pipes and tubes with attention to existing infrastructure (e.g. electrical wiring)
Install and maintain water supply systems
Locate and repair issues with water supply lines (e.g. leaks)
Repair or replace broken drainage ...